Restructuring of the Galin Swimming Pool (France)

01/2018

In order to support the City of Bordeaux, in France, in the different phases of the project (program, studies, site monitoring and acceptance), Synairgis was chosen for the integration and compliance with environmental criteria in a HQE Sustainable Building 2016 approach and the overall commissioning process for the operation.


Building Commissioning - Our mandate as a building commissioning coordinator :

  • Application and monitoring of the site charter with low environmental impact and the management system of the operation
  • Assistance in the technical and economic optimization (overall cost) of the project in collaboration with the consultants of the prime contractor.  